Expert-review checklist (wind O&M) — Turbine 7

Kit 9 · Turbine 7 · for a wind operations and maintenance SME · to complete before any pilot · fictional case

Status

Not yet reviewed. The cases, figures and 3D machine were written from public, general knowledge of offshore wind operations. An SME has not checked them. This checklist is what the review should cover.

How to review

Play two shifts in the simulator (2D is quicker; 3D shows the machine). Then go through the list. For each item mark OK, Change (with a note) or Not applicable.

1. The decision patterns

#CheckOK / Change / N/ANotes
1.1The four patterns are a fair simplification of how restart calls are made after alarms
1.2"Rising trend, no inspection" should be a hold in every case shown, at the figures shown
1.3"Fault came back after a reset" should be a hold for the pitch (094) and yaw (105) cases
1.4The two restart patterns would not be held at a typical site
1.5Escalate is defensible (1 point) but not best in the hold cases; would your site agree?
1.6Derating a rising trend is rightly treated as a critical error

2. The cases and evidence

#CheckOK / Change / N/ANotes
2.1Alarm titles and readings are plausible for a large offshore turbine (no specific OEM)
2.2Alarm bands (vibration 4.5 mm/s, bearing 70/80 °C, coolant 25 l/min, pitch error 2°, yaw 25 A) are plausible as illustrative values
2.3The evidence on each part (inspection card, work order, reset log, trip record) is what a technician would actually check
2.4The sister-turbine comparison is used the way a control room would use it
2.5The storm cut-out and restart figures (25 m/s cut-out, restart after the mean falls) are plausible
2.6The grid ride-through figures (0.62 p.u., 380 ms) are plausible

3. The consequences

#CheckOK / Change / N/ANotes
3.1A gearbox or main-bearing failure leading to a jack-up vessel and a multi-week wait is a fair illustration
3.2Crew transfer by CTV to the boat landing, at first light or at the next transfer, is shown realistically
3.3A recurring pitch fault leading to an unbalanced rotor and a trip is a fair illustration
3.4The €/day figures are in a plausible range as illustrations (they are labelled as such)

4. The machine (3D)

#CheckOK / Change / N/ANotes
4.1Drivetrain layout (main bearing, three-stage gearbox, brake, generator, converter, transformer, yaw drives) is recognisable for a geared turbine
4.2Nothing shown would teach a wrong physical habit (for example, standing where you should not)
4.3The opening roof and sliding spinner nose are acceptable as explanatory cutaways, given the on-screen notice that says what real hatches and spinners do
4.4Twelve yaw drives inside the yaw bearing, with brake calipers between them, is plausible for an offshore machine of this size

5. The production-desk voice and the handover note

#CheckOK / Change / N/ANotes
5.1The production-desk lines sound like real pressure, not a caricature
5.2The "number, risk, next step" reply would work with a real production desk
5.3The model handover notes read like a real technician's note

6. Safety and scope

#CheckOK / Change / N/ANotes
6.1Nothing contradicts standard lock-out / tag-out or site safety rules
6.2The disclaimers (illustrative figures, not OEM procedures) are clear enough
6.3Anything a site would need to localise (escalation boundary, alarm codes) is flagged

Sign-off

Reviewer role and years in wind O&M: ________ · Date: ________ · Cases to change before the pilot: ________